Me, in southern Portugal: you seen that Spain and Morocco are contemplating a rail tunnel?
@Zoë O'Connell, also in southern Portugal: But they won’t build a rail line to here? WHY EVEN IS SPAIN?
Me: That would be HARD, Zoe. They’d have to build a rail line over at least THREE KILOMETRES of line across land nobody lives on and construct a bridge of about TWO HUNDRED METRES.
So difficult.
timeout.com/news/there-could-b…
There could be an underwater tunnel linking Europe and Africa by 2030
Eurostar, you have competitionLiv Kelly (Time Out)
like this
reshared this
Sarah Brown
in reply to Sarah Brown • •@Zoë O'Connell My mistake. 25 km of empty land alongside a motorway.
SO HARD
Jon Worth
in reply to Sarah Brown • • •Sarah Brown
in reply to Jon Worth • •Jon Worth
in reply to Sarah Brown • • •Sarah Brown
Unknown parent • •Sarah Brown
Unknown parent • •@João Tiago Rebelo @Zoë O'Connell Also, were a bridge to be constructed, it would face the insurmountable engineering challenge of water that is thousands upon thousands of millimetres deep.
So there’s that.
Alexandra Lanes likes this.
Jon Worth
Unknown parent • • •Sion [main]
in reply to Sarah Brown • • •Sarah Brown
in reply to Sion [main] • •Richard Gadsden
in reply to Sarah Brown • • •Spanish railways were originally built to six (Castilian) feet. Portuguese ones to five (Portuguese) feet. These are, however, only 8mm different - Portugal being 1664mm, Spain 1672mm.
When the two networks joined up (1880s), they agreed a compromise "Iberian" gauge of 1668mm, and gradually all track was switch to that, which was officially completed in 1955.
So yeah, they already fixed *that* problem 70 years go.